Planning your remodel

How long does a kitchen remodel take in Saint Louis?

Short answer: a typical Saint Louis kitchen remodel runs about 4 to 8 weeks from demo to done, depending on scope and how much you change the layout. The cabinets themselves are rarely the bottleneck: we quote in 24 hours, your order usually reaches our shop in about two weeks, and assembled cabinets are ready 3 to 4 weeks from your order. The schedule usually turns on demo, plumbing and electrical, and countertop templating, which can only happen after the cabinets are set.

By STL Cabinetry, Saint Louis5 min read

Here is the realistic week-by-week so you can plan around it.

Before demo: design and ordering

The planning phase is where you control the timeline. The faster you finalize the layout and place the cabinet order, the sooner everything downstream can start.

  • Quote and 3D design: we turn a set of measurements into a full quote and a photorealistic 3D design, usually within 24 hours.
  • Finalize selections: door style, layout, countertop slab, flooring. A day to a couple of weeks, at your pace.
  • Cabinet lead time: your order usually reaches our shop in about two weeks; plan on 3 to 4 weeks from order to ready for assembled cabinets. Order the cabinets before demo so they arrive on schedule.

Weeks 1 to 2: demo and rough-in

Demo is fast, usually a couple of days. The time goes into what happens after: moving plumbing or electrical for a new layout, patching, and any drywall work. If you are keeping the same footprint, this phase is short. If you are moving the sink or adding an island, budget more.

Weeks 2 to 4: cabinets, then counters

Once the room is prepped, your installer sets the cabinets. This is the milestone the rest of the project waits on, because the countertop cannot be templated until the cabinets are in place.

After the cabinets are set, the fabricator templates the counters. Fabrication then takes 1 to 3 weeks. This countertop gap is the single most common reason a kitchen is "almost done" for longer than expected, so plan for it.

Weeks 4 to 8: counters, backsplash, finish

Countertops install in a day. Then backsplash, plumbing hookups, appliance installation, and final touches. Flooring goes in either before cabinets or at the end depending on the plan. Most kitchens are fully finished 4 to 8 weeks after demo.

How to keep it on schedule

The two things that keep a remodel on time are ordering cabinets early and locking selections before demo starts.

  • Get your cabinet quote and place the order before demo, so the 2 to 3 week lead time runs in parallel with prep.
  • Finalize your countertop slab early so the fabricator can template the day after cabinets are set.
  • Line up your installer before delivery day so cabinets are set as soon as they arrive.

Start the clock

Get your quote and design so the cabinets are never the holdup.

Send your measurements and we will quote the kitchen and design it in 3D, usually within 24 hours. Matt will call to see if you qualify for our deal.

+1 314 441 5620
The design table in the STL Cabinetry O’Fallon showroom